Pages that link to "Item:Q992569"
From MaRDI portal
The following pages link to A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569):
Displaying 4 items.
- An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem (Q6588464) (← links)
- A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty (Q6601552) (← links)
- A new mathematical model for hybrid flow shop under time-varying resource and exact time-lag constraints (Q6629023) (← links)
- Investigating constraint programming and hybrid methods for real world industrial test laboratory scheduling (Q6657888) (← links)