Pages that link to "Item:Q1869705"
From MaRDI portal
The following pages link to Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge (Q1869705):
Displaying 15 items.
- Production flow prototyping subject to imprecise activity specification (Q3451513) (← links)
- FUZZY LINEAR PROGRAMMING FOR SUPPLY CHAIN PLANNING UNDER UNCERTAINTY (Q3565424) (← links)
- (Q4475482) (← links)
- (Q4519512) (← links)
- Three types of models for stochastic scheduling with fuzzy information (Q4812284) (← links)
- Is Time Fuzzy? (Q5126370) (← links)
- (Q5132926) (← links)
- An interactive possibilistic programming approach for a multi-objective closed-loop supply chain network under uncertainty (Q5172559) (← links)
- A robust possibilistic programming model for a responsive closed loop supply chain network design (Q5193421) (← links)
- A new robust possibilistic programming model for reliable supply chain network design: A case study of lead-acid battery supply chain (Q5214305) (← links)
- The Emergence of Fuzzy Sets: A Historical Perspective (Q5241452) (← links)
- Fuzzy approach for production planning and detailed scheduling in paints manufacturing (Q5438612) (← links)
- Soft robust solutions to possibilistic optimization problems (Q6057607) (← links)
- Design of a multi echelon product recovery embeded reverse logistics network for multi products and multi periods (Q6170575) (← links)
- A robust possibilistic programming framework for designing an organ transplant supply chain under uncertainty (Q6179182) (← links)