Pages that link to "Item:Q3340483"
From MaRDI portal
The following pages link to Minimizing the average deviation of job completion times about a common due date (Q3340483):
Displaying 7 items.
- Minimizing mean squared deviation of completion times with maximum tardiness constraint (Q5925939) (← links)
- Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties (Q5936755) (← links)
- Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date (Q5937351) (← links)
- Benchmarks for scheduling on a single machine against restrictive and unrestrictive common due dates (Q5953167) (← links)
- A heuristic for single machine common due date assignment problem with different earliness/tardiness weights (Q6059906) (← links)
- Formulations and an adaptive large neighborhood search for just-in-time scheduling of unrelated parallel machines with a common due window (Q6164365) (← links)
- Self-adaptive biased differential evolution for scheduling against common due dates (Q6579091) (← links)