Pages that link to "Item:Q1849826"
From MaRDI portal
The following pages link to Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic (Q1849826):
Displaying 7 items.
- A multi-agent system for integrated scheduling and maintenance planning of the flexible job shop (Q6047924) (← links)
- Differential evolution algorithm with dynamic multi-population applied to flexible job shop schedule (Q6048122) (← links)
- A decomposition-based artificial bee colony algorithm for the multi-objective flexible jobshop scheduling problem (Q6094486) (← links)
- Logic-based Benders decomposition for the preemptive flexible job-shop scheduling problem (Q6164353) (← links)
- Simulated-annealing-based hyper-heuristic for flexible job-shop scheduling (Q6191890) (← links)
- A study of flexible flow shop scheduling problem with various heterogeneous labors (Q6484436) (← links)
- Flexible job-shop scheduling with limited flexible workers using an improved multiobjective discrete teaching-learning based optimization algorithm (Q6640152) (← links)