Pages that link to "Item:Q1000994"
From MaRDI portal
The following pages link to Minimizing total completion time in two-machine flow shops with exact delays (Q1000994):
Displaying 10 items.
- Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration (Q621032) (← links)
- A two-machine flowshop problem with two agents (Q709115) (← links)
- Exact method for the two-machine flow-shop problem with time delays (Q829189) (← links)
- Scheduling coupled tasks with exact delays for minimum total job completion time (Q2061138) (← links)
- Coupled task scheduling with exact delays: literature review and models (Q2282490) (← links)
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard (Q2464428) (← links)
- Minimizing total completion time in a two-machine flowshop: Analysis of special cases (Q4645936) (← links)
- Minimizing the total weighted completion time in a two-machine proportionate flow shop with different machine speeds (Q5478829) (← links)
- Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays (Q5505680) (← links)
- Approximation algorithms for coupled task scheduling minimizing the sum of completion times (Q6179222) (← links)