Pages that link to "Item:Q1005604"
From MaRDI portal
The following pages link to A GA optimization model for workgroup-based repetitive scheduling (WoRSM) (Q1005604):
Displaying 3 items.
- Genetic algorithm-based multi-objective model for scheduling of linear construction projects (Q945935) (← links)
- A biobjective optimization model for deadline satisfaction in line-of-balance scheduling with work interruptions consideration (Q1721280) (← links)
- Optimization of a highway project planning using a modified genetic algorithm (Q4981882) (← links)