Pages that link to "Item:Q1037696"
From MaRDI portal
The following pages link to A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns'' (Q1037696):
Displaying 10 items.
- Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework (Q522439) (← links)
- An EPQ model with inflation in an imperfect production system (Q632837) (← links)
- The economic production quantity with rework process in supply chain management (Q660917) (← links)
- Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns (Q869601) (← links)
- Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework (Q990778) (← links)
- Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair (Q1011913) (← links)
- Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management (Q1630159) (← links)
- On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown (Q1630160) (← links)
- A production inventory supply chain model with partial backordering and disruption under triangular linguistic dense fuzzy lock set approach (Q2152882) (← links)
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items (Q5172467) (← links)