Pages that link to "Item:Q1086143"
From MaRDI portal
The following pages link to Time-optimal control in a single machine problem with resource constraints (Q1086143):
Displaying 33 items.
- Considerations of single-machine scheduling with deteriorating jobs (Q651712) (← links)
- Single machine scheduling with resource dependent release times and processing times (Q704120) (← links)
- Single machine group scheduling with resource dependent setup and processing times (Q707136) (← links)
- Single machine scheduling problems with resource dependent release times (Q868136) (← links)
- Single machine scheduling problem with controllable processing times and resource dependent release times (Q877039) (← links)
- A note on single-machine scheduling with decreasing time-dependent job processing times (Q967802) (← links)
- Scheduling two agents with controllable processing times (Q976351) (← links)
- Optimal control of production processes with variable execution times (Q977002) (← links)
- A multi-objective approach to resource allocation in single machine scheduling (Q1173857) (← links)
- Single machine scheduling problem with a common deadline and resource dependent release dates (Q1178528) (← links)
- Minimization of resource consumption under a given deadline in the two- processor flow-shop scheduling problem (Q1262204) (← links)
- On minimizing resource consumption with constraints on the makespan and the total completion time (Q1278541) (← links)
- Minimization of the makespan in a two-machine problem under given resource constraints (Q1296091) (← links)
- Scheduling to minimize the total weighted completion time with a constraint on the release time resource consumption (Q1341400) (← links)
- Job-shop scheduling with convex models of operations (Q1341401) (← links)
- Single machine scheduling with a variable common due date and resource-dependent processing times. (Q1413814) (← links)
- Single machine batch scheduling with jointly compressible setup and processing times. (Q1417506) (← links)
- Single machine scheduling problems with deteriorating jobs (Q1764739) (← links)
- Group scheduling with controllable setup and processing times: minimizing total weighted completion time (Q1772970) (← links)
- Single machine earliness-tardiness scheduling with resource-dependent release dates (Q1847239) (← links)
- Single machine batch scheduling with deadlines and resource dependent processing times (Q1924618) (← links)
- Resource-aware time-optimal control with multiple sparsity measures (Q2059349) (← links)
- Makespan optimization in a single-machine scheduling problem with dynamic job ready times-complexity and algorithms (Q2255056) (← links)
- Complexity analysis of an assignment problem with controllable assignment costs and its applications in scheduling (Q2275933) (← links)
- A survey of scheduling with controllable processing times (Q2381529) (← links)
- Single-machine scheduling with time-and-resource-dependent processing times (Q2428936) (← links)
- Scheduling with controllable release dates and processing times: Makespan minimization (Q2433440) (← links)
- Scheduling with controllable release dates and processing times: total completion time minimization (Q2433441) (← links)
- A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates (Q2434249) (← links)
- Single-machine scheduling problems with an aging effect (Q2471338) (← links)
- SCHEDULING WITH DISCRETELY COMPRESSIBLE RELEASE DATES TO MINIMIZE MAKESPAN (Q3052719) (← links)
- General flow-shop scheduling with resource constraints (Q3780743) (← links)
- Single machine batch scheduling with resource dependent setup and processing times (Q5954835) (← links)