Pages that link to "Item:Q1107431"
From MaRDI portal
The following pages link to Controlled alternative activity networks for project management (Q1107431):
Displaying 8 items.
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach (Q872140) (← links)
- A classified bibliography of recent research relating to project risk management (Q1127233) (← links)
- Resource constrained scheduling simulation model for alternative stochastic network projects. (Q1399956) (← links)
- A buffer control method for top-down project control (Q1754043) (← links)
- Developing activity duration specification limits for effective project control (Q2503086) (← links)
- Generalized stochastic network models for the management of complex projects (Q2898980) (← links)
- A generalized activity network model (Q4363742) (← links)
- On-line control model for network construction projects (Q4367030) (← links)