Pages that link to "Item:Q1117830"
From MaRDI portal
The following pages link to Cost-benefit analysis with switching regimes: An application of the theory of planning (Q1117830):
Displaying 4 items.
- Dynamic cost-benefit analysis of large projects: the role of capital cost (Q608870) (← links)
- Cost-benefit analysis with switching regimes: An application of the theory of planning (Q1117830) (← links)
- Optimal switch from a fossil-fueled to an electric vehicle (Q2064640) (← links)
- Structural estimation of switching costs for peaking power plants (Q2183304) (← links)