Pages that link to "Item:Q1124816"
From MaRDI portal
The following pages link to Scheduling of design projects with uncertain number of iterations (Q1124816):
Displaying 6 items.
- An effective approach for scheduling coupled activities in development projects (Q319026) (← links)
- The impact of design uncertainty in engineer-to-order project planning (Q1753659) (← links)
- A variable-grouping based genetic algorithm for large-scale integer programming (Q2509223) (← links)
- Multi-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergency (Q2988474) (← links)
- A Predictive Model of Sequential Iteration in Engineering Design (Q4363664) (← links)
- A CTMDP-Based Exact Method for RCPSP with Uncertain Activity Durations and Rework (Q4685811) (← links)