Pages that link to "Item:Q1203795"
From MaRDI portal
The following pages link to Integrated procurement-production systems: A review (Q1203795):
Displaying 8 items.
- A cyclic versus flexible approach to materials ordering in make-to-order assembly (Q815325) (← links)
- Different approaches to a flow shop problem (Q1331623) (← links)
- On the global optimal solution to an integrated inventory system with general time varying demand, production and deterioration rates (Q1809821) (← links)
- Integrated inventory management and supplier base reduction in a supply chain with multiple uncertainties (Q2255972) (← links)
- Integrated procurement-production inventory model for defective items with variable setup and ordering cost (Q2359228) (← links)
- Monolithic versus hierarchical approach to integrated scheduling in a supply chain (Q3055263) (← links)
- (Q3388239) (← links)
- Optimal and simple algorithms to solve integrated procurement-production-inventory problem without/with shortage (Q4611479) (← links)