Pages that link to "Item:Q1266598"
From MaRDI portal
The following pages link to Scheduling about a given common due date to minimize mean squared deviation of completion times (Q1266598):
Displaying 10 items.
- Minimizing total earliness and tardiness on a single machine using a hybrid heuristic (Q878591) (← links)
- Scheduling to minimize weighted earliness and tardiness about a common due-date (Q1186924) (← links)
- A quadratic integer programming method for minimizing the mean squared deviation of completion times (Q1342085) (← links)
- The single machine weighted mean squared deviation problem (Q1753598) (← links)
- On the complexity of the single machine scheduling problem minimizing total weighted delay penalty (Q1785249) (← links)
- An exact algorithm to minimize mean squared deviation of job completion times about a common due date (Q2356179) (← links)
- Solving a stochastic single machine problem with initial idle time and quadratic objective (Q2655649) (← links)
- Minimizing mean absolute deviation of completion times about a common due date (Q3735428) (← links)
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date (Q3777790) (← links)
- Minimizing mean squared deviation of completion times with maximum tardiness constraint (Q5925939) (← links)