Pages that link to "Item:Q1278321"
From MaRDI portal
The following pages link to Comparison of iterative improvement techniques for schedule optimization (Q1278321):
Displaying 4 items.
- Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size (Q541698) (← links)
- A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis (Q1266705) (← links)
- A reusable iterative optimization software library to solve combinatorial problems with approximate reasoning (Q1606222) (← links)
- Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors — a case study (Q4671306) (← links)