Pages that link to "Item:Q1278798"
From MaRDI portal
The following pages link to Developing an integrated model of an aluminium smelter incorporating sub-models with different time bases and levels of aggregation (Q1278798):
Displaying 7 items.
- A two-phase model for planning the production of aluminum ingot (Q1130032) (← links)
- Modeling and observer design for aluminum manufacturing (Q2667537) (← links)
- Determining best practice production in an aluminium smelter involving sub-processes based substantially on tacit knowledge: an application of Communities of Practice (Q3505934) (← links)
- Goal and predictive coordination in two level hierarchical systems (Q3603693) (← links)
- Optimizing the Operations of an Ingot Mill in an Aluminium Smelter (Q4319485) (← links)
- Aluminum Production Modeling—A Nonlinear Bilevel Programming Approach (Q4849321) (← links)
- Bilevel Optimization: Theory, Algorithms, Applications and a Bibliography (Q5014642) (← links)