Pages that link to "Item:Q1291590"
From MaRDI portal
The following pages link to Distribution requirements and compactness constraints in school timetabling (Q1291590):
Displaying 19 items.
- A fix-and-optimize heuristic for the high school timetabling problem (Q337176) (← links)
- Cyclic transfers in school timetabling (Q421072) (← links)
- A survey of school timetabling research (Q475201) (← links)
- Preference-based assignment of university students to multiple teaching groups (Q480755) (← links)
- A grasp-knapsack hybrid for a nurse-scheduling problem (Q835758) (← links)
- School timetabling for quality student and teacher schedules (Q842557) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Distribution requirements and compactness constraints in school timetabling (Q1291590) (← links)
- An integer programming formulation for a case study in university timetabling. (Q1417497) (← links)
- ProGen/\(\pi x\) -- An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions (Q1578557) (← links)
- A column generation approach to high school timetabling modeled as a multicommodity flow problem (Q1752250) (← links)
- Strong bounds with cut and column generation for class-teacher timetabling (Q1761917) (← links)
- Efficient solutions for a university timetabling problem through integer programming (Q1887870) (← links)
- A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q2152012) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)
- Towards constraint-based school timetabling (Q2468741) (← links)
- High quality timetables for Italian schools (Q2676380) (← links)
- An integer program and a hybrid genetic algorithm for the university timetabling problem (Q5268943) (← links)
- Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints (Q6588473) (← links)