Pages that link to "Item:Q1291643"
From MaRDI portal
The following pages link to Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions (Q1291643):
Displaying 6 items.
- Resource-constrained management of heterogeneous assets with stochastic deterioration (Q1042122) (← links)
- Flexible automation investments: A problem formulation and solution procedure (Q1342638) (← links)
- Long term capacity decisions in uncertain markets for advanced manufacturing systems incorporating scope economies (Q1848636) (← links)
- Formulations of the capacity planning problem considering manufacturing flexibility (Q4717418) (← links)
- The plant location and flexible technology acquisition problem. (Q5953331) (← links)
- Matheuristics: survey and synthesis (Q6056873) (← links)