Pages that link to "Item:Q1296081"
From MaRDI portal
The following pages link to Heuristics for multimode scheduling problems with dedicated resources (Q1296081):
Displaying 16 items.
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A new approach for scheduling independent tasks with multiple modes (Q835753) (← links)
- Simple heuristics for scheduling with limited intermediate storage (Q868994) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems (Q1096529) (← links)
- Heuristic for scheduling in a Kanban system with dual blocking mechanisms (Q1280177) (← links)
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application (Q1291582) (← links)
- Heuristics for scheduling with inventory: Dynamic focus via constraint criticality (Q1347601) (← links)
- A binary-rounding heuristic for multi-period variable-task-duration assignment problems (Q1919790) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation (Q2336415) (← links)
- Heuristic for a new multiobjective scheduling problem (Q2463826) (← links)
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem (Q2629594) (← links)
- A new heuristic for the multi-mode resource investment problem (Q4679786) (← links)
- Minimizing makespan in a multimode multiprocessor shop scheduling problem (Q4943556) (← links)
- A review of the contribution of operational research to project management (Q5955087) (← links)