Pages that link to "Item:Q1296105"
From MaRDI portal
The following pages link to Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (Q1296105):
Displaying 50 items.
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q280157) (← links)
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973) (← links)
- A branch-price-and-cut algorithm for multi-mode resource leveling (Q319528) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- An efficient algorithm for the multi-mode resource constrained project scheduling problem with resource flexibility (Q606604) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- On a fix-and-relax framework for a class of project scheduling problems (Q817205) (← links)
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags (Q929315) (← links)
- Scheduling projects with heterogeneous resources to meet time and quality objectives (Q954926) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- Differential evolution for solving multi-mode resource-constrained project scheduling problems (Q1010277) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- A note on ``Hierarchical models for multi-project planning and scheduling'' (Q1278323) (← links)
- PSPLIB -- a project scheduling problem library (Q1278481) (← links)
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (Q1296105) (← links)
- Resource-constrained project scheduling. Exact methods for the multi-mode case (Q1327722) (← links)
- An exact algorithm for project scheduling with multiple modes (Q1372766) (← links)
- Lower bounds for resource-constrained project scheduling problems. (Q1399575) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- List scheduling in a parallel machine environment with precedence constraints and setup times (Q1604056) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254) (← links)
- Network decomposition-based benchmark results for the discrete time-cost tradeoff problem (Q1772839) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q1807061) (← links)
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (Q1869389) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem (Q2120134) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- A polyhedral study of event-based models for the resource-constrained project scheduling problem (Q2173056) (← links)
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds (Q2215556) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Benders decomposition, Lagrangean relaxation and metaheuristic design (Q2271124) (← links)
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems (Q2467429) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- Bicriteria train scheduling for high-speed passenger railroad planning applications (Q2566708) (← links)
- Integrated multi-project planning and scheduling -- a multiagent approach (Q2672092) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem (Q2892296) (← links)
- (Q3044286) (← links)