Pages that link to "Item:Q1296106"
From MaRDI portal
The following pages link to On the optimal management of project risk (Q1296106):
Displaying 22 items.
- Minimization of project time and cost under constrained reliability index in the disjunctive project model (Q384696) (← links)
- A heuristic approach for resource constrained project scheduling with uncertain activity durations (Q632677) (← links)
- A robust approach for the single machine scheduling problem (Q835547) (← links)
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations (Q991368) (← links)
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem (Q992657) (← links)
- Maximizing the net present value of a project under uncertainty (Q1039778) (← links)
- A classified bibliography of recent research relating to project risk management (Q1127233) (← links)
- Improving project cost estimation by taking into account managerial flexibility (Q1590029) (← links)
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem (Q1636886) (← links)
- Improving electromagnetism algorithm for solving resource allocation problem in stochastic networks (Q1652374) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- Project scheduling under uncertainty: survey and research potentials (Q1772834) (← links)
- On the fallacy of averages in project risk management (Q1772835) (← links)
- The construction of stable project baseline schedules (Q1877894) (← links)
- The effect of risk aversion on the optimal project resource rate (Q2023999) (← links)
- Project management for arbitrary random durations and cost attributes by applying network approaches (Q2389509) (← links)
- Techniques for the analysis of risks in major projects (Q3157707) (← links)
- CAUTIOUS ANALYSIS OF PROJECT RISKS BY INTERVAL-VALUED INITIAL DATA (Q3427039) (← links)
- Activity Delay in Stochastic Project Networks (Q4367270) (← links)
- (Q4383860) (← links)
- THE MATHEMATICAL MODEL OF PROJECT RISK RESPONSES IN PROJECT RISK MANAGEMENT (Q5365663) (← links)
- A review of the contribution of operational research to project management (Q5955087) (← links)