Pages that link to "Item:Q1302741"
From MaRDI portal
The following pages link to On integrated production-replenishment policies in single-stage manufacturing (Q1302741):
Displaying 5 items.
- An \((s,Q)\) policy with setup reduction in a single-stage batch manufacturing system (Q1185985) (← links)
- On the \((t,S_ j)\) policy in an integrated production/inventory model with time-proportional demand (Q1310706) (← links)
- The determination of the optimal component input numbers for the completion of a single manufacturing order (Q1390265) (← links)
- Decomposed vs. integrated control of a one-stage production system (Q1600940) (← links)
- An optimal policy for a just-in-time integrated manufacturing system for time-varying demand process (Q2282415) (← links)