Pages that link to "Item:Q1341993"
From MaRDI portal
The following pages link to A bounding scheme for deriving the minimal cycle time of a single- transporter \(N\)-stage process with time-window constraints (Q1341993):
Displaying 14 items.
- Optimal \(K\)-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times (Q282247) (← links)
- Robust optimization for the cyclic hoist scheduling problem (Q300031) (← links)
- Scheduling multiple factory cranes on a common track (Q337056) (← links)
- Converging to periodic schedules for cyclic scheduling problems with resources and deadlines (Q337140) (← links)
- An efficient new heuristic for the hoist scheduling problem (Q342278) (← links)
- A graph-based analysis of the cyclic scheduling problem with time constraints: schedulability and periodicity of the earliest schedule (Q633540) (← links)
- A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags (Q872246) (← links)
- An improved algorithm for cyclic flowshop scheduling in a robotic cell (Q1278650) (← links)
- Combinatorial optimization models for production scheduling in automated manufacturing systems (Q1278813) (← links)
- Determining the optimal starting times in a cyclic schedule with a given route (Q1310046) (← links)
- Minimizing the fleet size with dependent time-window and single-track constraints (Q1317008) (← links)
- Steady state analysis of timed event graphs with time window constraints (Q2440115) (← links)
- Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints (Q2467264) (← links)
- A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows (Q3163144) (← links)