Pages that link to "Item:Q1342037"
From MaRDI portal
The following pages link to Group scheduling jobs on a single machine: A multi-objective approach with preemptive priority structure (Q1342037):
Displaying 6 items.
- On cell size and machine requirements planning in group technology systems (Q1309956) (← links)
- An enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes (Q1652033) (← links)
- A group priority earliest deadline first scheduling algorithm (Q1762218) (← links)
- An improved LS algorithm for the problem of scheduling multi groups of jobs on multi processors at the same speed (Q2867376) (← links)
- Fabrication scheduling on a single machine to minimize the weighted sum of product completion time (Q5436246) (← links)
- Fabrication scheduling on a single machine with due date constraints (Q5955094) (← links)