Pages that link to "Item:Q1357788"
From MaRDI portal
The following pages link to Rolling horizon scheduling in a rolling-mill (Q1357788):
Displaying 10 items.
- Integrated maritime fleet deployment and speed optimization: case study from RoRo shipping (Q337431) (← links)
- Integration of continuous caster and hot strip mill planning for steel production (Q1585914) (← links)
- The hot strip mill production scheduling problem: A tabu search approach (Q1609896) (← links)
- Development of hybrid evolutionary algorithms for production scheduling of hot strip mill (Q1761983) (← links)
- Multiple level production planning in rolling horizon assembly environments (Q1809820) (← links)
- A matheuristic for the generalized order acceptance and scheduling problem (Q2077965) (← links)
- Modeling and application for rolling scheduling problem based on TSP (Q2243302) (← links)
- A two-phase algorithm for rolling batch planning based on simulated annealing (Q2725091) (← links)
- A Tire Production Scheduling System for Bridgestone/Firestone Off-The-Road (Q4384082) (← links)
- Scheduling a hot rolling mill (Q5428937) (← links)