Pages that link to "Item:Q1374455"
From MaRDI portal
The following pages link to An analysis of heuristics for the parallel-machine flexible-resource scheduling problem (Q1374455):
Displaying 11 items.
- Static and dynamic resource allocation models for recovery of interdependent systems: application to the Deepwater Horizon oil spill (Q314779) (← links)
- Scheduling with flexible resources in parallel workcenters to minimize maximum completion time (Q850309) (← links)
- Worst-case analysis of scheduling heuristics of parallel systems (Q1274368) (← links)
- Heuristics for parallel-machine flexible-resource scheduling problems with unspecified job assignment (Q1302577) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- A new approximation algorithm for unrelated parallel machine scheduling with release dates (Q2289003) (← links)
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods (Q2356015) (← links)
- A Heuristic of Scheduling Parallel Tasks and Its Analysis (Q3990654) (← links)
- Cyclic job scheduling in paced assembly lines with cross-trained workers (Q5444459) (← links)
- Scheduling of unrelated parallel manufacturing cells with limited human resources (Q5444619) (← links)
- Exact algorithms for a parallel machine scheduling problem with workforce and contiguity constraints (Q6551087) (← links)