Pages that link to "Item:Q1390285"
From MaRDI portal
The following pages link to Single machine, scheduling problem with fuzzy precedence relation (Q1390285):
Displaying 14 items.
- A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions (Q853448) (← links)
- Multi-objective genetic algorithm for single machine scheduling problem under fuzziness (Q928186) (← links)
- Fuzzy job shop scheduling with lot-sizing (Q940894) (← links)
- Optimal fuzzy counterparts of scheduling rules (Q1124817) (← links)
- Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters. (Q1426739) (← links)
- Survey on fuzzy shop scheduling (Q1794871) (← links)
- On two single machine scheduling problems with fuzzy processing times and fuzzy due dates (Q1869711) (← links)
- Scheduling with fuzzy delays and fuzzy precedences. (Q1873188) (← links)
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms (Q1969842) (← links)
- Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine (Q2429059) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- Batch scheduling problem with due-date and fuzzy precedence relation (Q2907903) (← links)
- The EDD rule for fuzzy job time (Q5293405) (← links)
- (Q5400032) (← links)