Pages that link to "Item:Q1392579"
From MaRDI portal
The following pages link to Uniform machine scheduling of unit-time jobs subject to resource constraints (Q1392579):
Displaying 17 items.
- Uniform parallel machine scheduling problems with fixed machine cost (Q683926) (← links)
- Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs (Q858442) (← links)
- A scheduling problem with job values given as a power function of their completion times (Q954933) (← links)
- Scheduling of unit-length jobs with cubic incompatibility graphs on three uniform machines (Q1686064) (← links)
- Scheduling job classes on uniform machines (Q1761112) (← links)
- A polynomial algorithm for lot-size scheduling of two type tasks. (Q1853075) (← links)
- Uniform parallel machine scheduling with resource consumption constraint (Q2009726) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods (Q2356015) (← links)
- Vyacheslav Tanaev: contributions to scheduling and related areas (Q2434293) (← links)
- Scheduling unit-length jobs with machine eligibility restrictions (Q2503099) (← links)
- No-idle parallel-machine scheduling of unit-time jobs with a small number of distinct release dates and deadlines (Q2668758) (← links)
- (Q3308224) (← links)
- (Q3402864) (← links)
- Scheduling unit-time tasks in renewable resource constrained flowshops (Q4031376) (← links)
- Performance guarantee of the jump neighborhood for scheduling jobs on uniformly related machines (Q5074358) (← links)
- A Log-Linear $$(2 +5/6)$$-Approximation Algorithm for Parallel Machine Scheduling with a Single Orthogonal Resource (Q6487188) (← links)