Pages that link to "Item:Q1398022"
From MaRDI portal
The following pages link to Four-day workweek scheduling with two or three consecutive days off (Q1398022):
Displaying 10 items.
- Optimum workforce scheduling under the (14, 21) days-off timetable (Q1428291) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- Designing an annual leave scheduling policy: case of a financial center (Q2086959) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)
- Dual-based optimization of cyclic four-day workweek scheduling (Q2747665) (← links)
- Multiple shift scheduling of workforce on four-day workweeks (Q3154403) (← links)
- A set-processing algorithm for scheduling staff on 4-day or 3-day work weeks (Q4248933) (← links)
- A Multiple-Shift Workforce Scheduling Model Under the 4-Day Workweek with Weekday and Weekend Labour Demands (Q4319494) (← links)
- Bounded flexibility in days-on and days-off scheduling (Q4629207) (← links)
- A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE (Q5850791) (← links)