Pages that link to "Item:Q1399576"
From MaRDI portal
The following pages link to On linear lower bounds for the resource constrained project scheduling problem. (Q1399576):
Displaying 27 items.
- An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration (Q319357) (← links)
- A preemptive bound for the resource constrained project scheduling problem (Q398922) (← links)
- Project scheduling with flexible resources: formulation and inequalities (Q443821) (← links)
- A survey of dual-feasible and superadditive functions (Q610986) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- Event-based MILP models for resource-constrained project scheduling problems (Q709100) (← links)
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations (Q709101) (← links)
- Approximability results for the resource-constrained project scheduling problem with a single type of resources (Q744638) (← links)
- Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound (Q766253) (← links)
- Computing redundant resources for the resource constrained project scheduling problem (Q853022) (← links)
- Lower bounds for resource-constrained project scheduling problems. (Q1399575) (← links)
- A linear programming and constraint propagation-based lower bound for the RCPSP (Q1590041) (← links)
- A new LP-based lower bound for the cumulative scheduling problem (Q1590042) (← links)
- An exact composite lower bound strategy for the resource-constrained project scheduling problem (Q1652587) (← links)
- Redundant cumulative constraints to compute preemptive bounds (Q1686060) (← links)
- Lower bounds for the event scheduling problem with consumption and production of resources (Q1686062) (← links)
- An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem (Q1711441) (← links)
- Enhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problem (Q1762094) (← links)
- Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling (Q1806914) (← links)
- Tight LP bounds for resource constrained project scheduling (Q1880319) (← links)
- A polyhedral study of event-based models for the resource-constrained project scheduling problem (Q2173056) (← links)
- A project scheduling problem with periodically aggregated resource-constraints (Q2669745) (← links)
- Horizontally elastic edge-finder algorithm for cumulative resource constraint revisited (Q2677344) (← links)
- THE LEXICO-BOUNDED FLOW ALGORITHM FOR SOLVING THE MINIMUM COST PROJECT SCHEDULING PROBLEM WITH AN ADDITIONAL LINEAR CONSTRAINT (Q3220333) (← links)
- (Q3426433) (← links)
- Principles and Practice of Constraint Programming – CP 2004 (Q5900297) (← links)
- A binary search algorithm for the general coupled task scheduling problem (Q6057721) (← links)