Pages that link to "Item:Q1410331"
From MaRDI portal
The following pages link to The complexity of two-job shop problems with multi-purpose unrelated machines. (Q1410331):
Displaying 5 items.
- An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems (Q440881) (← links)
- Scheduling with arranged multi-purpose machines (Q614212) (← links)
- On the complexity of non-preemptive shop scheduling with two jobs (Q1849563) (← links)
- Job-shop scheduling in a body shop (Q2434313) (← links)
- A note on scheduling alternative operations in two-machine flowshops (Q3157717) (← links)