Pages that link to "Item:Q1413868"
From MaRDI portal
The following pages link to Single machine scheduling to minimize the number of late jobs under uncertainty. (Q1413868):
Displaying 7 items.
- Single machine scheduling problems with uncertain parameters and the OWA criterion (Q282249) (← links)
- Minimizing the number of late jobs on a single machine under due date uncertainty (Q657256) (← links)
- A possibilistic approach to sequencing problems with fuzzy parameters (Q1770715) (← links)
- Survey on fuzzy shop scheduling (Q1794871) (← links)
- A single-machine scheduling problem with uncertainty in processing times and outsourcing costs (Q1992893) (← links)
- SOME GENERAL PROPERTIES OF A FUZZY SINGLE MACHINE SCHEDULING PROBLEM (Q3442757) (← links)
- Min–max version of single-machine scheduling with generalized due dates under scenario-based uncertainty (Q6094564) (← links)