Pages that link to "Item:Q1417853"
From MaRDI portal
The following pages link to The flow shop scheduling polyhedron with setup times (Q1417853):
Displaying 9 items.
- Algorithms for a realistic variant of flowshop scheduling (Q732880) (← links)
- Heuristics for the flow line problem with setup costs (Q1303708) (← links)
- Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. (Q1406627) (← links)
- On the polyhedral structure of a multi-item production planning model with setup times (Q1411623) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives (Q2467260) (← links)
- Exact and matheuristic methods for the parallel machine scheduling and location problem with delivery time and due date (Q2676340) (← links)
- The flow shop problem with time lags and separated setup times (Q3734157) (← links)
- Flowshop with additional resources during setups: mathematical models and a GRASP algorithm (Q6109559) (← links)