Pages that link to "Item:Q1428291"
From MaRDI portal
The following pages link to Optimum workforce scheduling under the (14, 21) days-off timetable (Q1428291):
Displaying 13 items.
- A dynamic programming algorithm for days-off scheduling with sequence dependent labor costs (Q835588) (← links)
- An acyclic days-off scheduling problem (Q862817) (← links)
- Four-day workweek scheduling with two or three consecutive days off (Q1398022) (← links)
- An efficient two-phase algorithm for cyclic days-off scheduling. (Q1406704) (← links)
- Solving shift scheduling problem with days-off preference for power station workers using binary integer goal programming model (Q1730633) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)
- Dual-based optimization of cyclic four-day workweek scheduling (Q2747665) (← links)
- Team-building with answer set programming in the Gioia-Tauro seaport (Q2909524) (← links)
- Multiple shift scheduling of workforce on four-day workweeks (Q3154403) (← links)
- Off-Day Scheduling with Hierarchical Worker Categories (Q3359983) (← links)
- Bounded flexibility in days-on and days-off scheduling (Q4629207) (← links)
- A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE (Q5850791) (← links)
- A note on a single-shift days-off scheduling problem with sequence-dependent labor costs (Q6173709) (← links)