Pages that link to "Item:Q1429934"
From MaRDI portal
The following pages link to Multi-objective design of team oriented assembly systems. (Q1429934):
Displaying 10 items.
- An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations (Q339701) (← links)
- Batching and scheduling in a multi-machine flow shop (Q954247) (← links)
- Using distributed search methods for balancing mixed-model assembly lines in the automotive industry (Q991823) (← links)
- A Lagrangian relaxation approach to the mixed-product assembly line sequencing problem: a case study of a door-lock company in Taiwan (Q1632965) (← links)
- Line configuration to minimize setup costs (Q1933899) (← links)
- Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches (Q2108816) (← links)
- A classification of assembly line balancing problems (Q2371356) (← links)
- Assembly line balancing and group working: a heuristic procedure for workers' groups operating on the same product and workstation (Q2489316) (← links)
- A survey on problems and methods in generalized assembly line balancing (Q2569060) (← links)
- The maximum length car sequencing problem (Q6565412) (← links)