Pages that link to "Item:Q1590030"
From MaRDI portal
The following pages link to Optimal timing of project control points (Q1590030):
Displaying 7 items.
- Determining the timing of project control points using a facility location model and simulation (Q337592) (← links)
- A nearest neighbour extension to project duration forecasting with artificial intelligence (Q1751933) (← links)
- A buffer control method for top-down project control (Q1754043) (← links)
- Using the generalized maximum covering location model to control a project's progress (Q2183555) (← links)
- Formulation and solution of an optimal control problem for industrial project control (Q2288881) (← links)
- Developing activity duration specification limits for effective project control (Q2503086) (← links)
- (Q4820320) (← links)