Pages that link to "Item:Q1590808"
From MaRDI portal
The following pages link to Minimizing maximum lateness with job families (Q1590808):
Displaying 17 items.
- An online algorithm for a problem in scheduling with set-ups and release times (Q534771) (← links)
- ILS heuristics for the single-machine scheduling problem with sequence-dependent family setup times to minimize total tardiness (Q670296) (← links)
- A simulated annealing algorithm for single machine scheduling problems with family setups (Q1013384) (← links)
- Scheduling with families of jobs and delivery coordination under job availability (Q1034606) (← links)
- Batch scheduling to minimize maximum lateness (Q1373461) (← links)
- A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness (Q1683059) (← links)
- A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups (Q1761169) (← links)
- Scheduling multi-operation jobs on a single machine (Q1960312) (← links)
- Heuristics for minimizing maximum lateness on a single machine with family-dependent set-up times (Q2462548) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Single machine scheduling with family setups to minimize total earliness and tardiness (Q2467252) (← links)
- Approximation algorithms for problems in scheduling with set-ups (Q2476258) (← links)
- Single machine scheduling with two job classes : minimizing maximum lateness (Q2764975) (← links)
- An exact method for the bi-objective one-machine problem with maximum lateness and unit family setup cost objectives (Q2861560) (← links)
- Single machine scheduling with sequence-dependent family setups to minimize maximum lateness (Q3585727) (← links)
- Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times (Q4363689) (← links)
- Minimizing <i>L</i> <sub>max</sub> for the single machine scheduling problem with family set-ups (Q4671323) (← links)