Pages that link to "Item:Q1592754"
From MaRDI portal
The following pages link to A PTAS for the average weighted completion time problem on unrelated machines. (Q1592754):
Displaying 7 items.
- Approximability of average completion time scheduling on unrelated machines (Q507314) (← links)
- Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems (Q622134) (← links)
- Designing PTASs for MIN-SUM scheduling problems (Q2489956) (← links)
- A PTAS for minimizing the total weighted completion time on identical parallel machines. (Q2757623) (← links)
- A PTAS for minimizing the weighted sum of job completion times on parallel machines (Q2819573) (← links)
- (Q4782744) (← links)
- Lift-and-Round to Improve Weighted Completion Time on Unrelated Machines (Q4997316) (← links)