Pages that link to "Item:Q1598772"
From MaRDI portal
The following pages link to An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns (Q1598772):
Displaying 9 items.
- Minimizing makespan for scheduling stochastic job shop with random breakdown (Q388592) (← links)
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function (Q1129910) (← links)
- Risk measure of job shop scheduling with random machine breakdowns (Q1654341) (← links)
- Scheduling under machine breakdown in a continuous process industry (Q1765549) (← links)
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures (Q2475628) (← links)
- An uncertain permutation flow shop predictive scheduling problem with processing interruption (Q2683283) (← links)
- Robust scheduling of multi-stage flow shop under machine breakdowns following expect-risk rule (Q3180139) (← links)
- Uncertain flexible flow shop scheduling problem subject to breakdowns (Q5275883) (← links)
- Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown (Q6179225) (← links)