Pages that link to "Item:Q1610152"
From MaRDI portal
The following pages link to Jointly optimal allocation of a repairman and optimal control of service rate for machine repairman problem (Q1610152):
Displaying 12 items.
- Productivity improvement by reduction of idle time through application of queuing theory (Q260666) (← links)
- A difference of convex functions algorithm for optimal scheduling and real-time assignment of preventive maintenance jobs on parallel processors (Q380561) (← links)
- Reasoning about proportional lumpability (Q832089) (← links)
- A survey of the machine interference problem (Q858463) (← links)
- Optimal repair of degrading computers under asymmetric information and incentive incompati\-bility. (Q1406679) (← links)
- Optimal allocation of machines to distinguishable repairmen in order to maximize some reward functions (Q2808297) (← links)
- (Q2938691) (← links)
- Corrective maintenance through dynamic work allocation and pre-emption: case study and application (Q3055406) (← links)
- On dispatching unequally capable service technicians (Q4461865) (← links)
- A Production/Inventory System Subject to Failure with Limited Repair Capacity (Q4530669) (← links)
- A SUCCESSIVE LUMPING PROCEDURE FOR A CLASS OF MARKOV CHAINS (Q4902486) (← links)
- DES AND RES PROCESSES AND THEIR EXPLICIT SOLUTIONS (Q5358035) (← links)