Pages that link to "Item:Q1615940"
From MaRDI portal
The following pages link to Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic (Q1615940):
Displaying 8 items.
- Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints (Q367232) (← links)
- Non-permutation flow shop scheduling with order acceptance and weighted tardiness (Q670790) (← links)
- Tabu search for non-permutation flowshop scheduling problem with minimizing total tardiness (Q711284) (← links)
- Exact method for the two-machine flow-shop problem with time delays (Q829189) (← links)
- Time lag size in multiple operations flow shop scheduling heuristics (Q1291707) (← links)
- Upper and lower bounds for the permutation flowshop scheduling problem with minimal time lags (Q2018863) (← links)
- Permutation flowshop scheduling problems with maximal and minimal time lags (Q2581596) (← links)
- Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints (Q4921223) (← links)