Pages that link to "Item:Q1626765"
From MaRDI portal
The following pages link to An update on the comparison of MIP, CP and hybrid approaches for mixed resource allocation and scheduling (Q1626765):
Displaying 12 items.
- Mixed integer programming models for job shop scheduling: A computational analysis (Q342439) (← links)
- IBM ILOG CP optimizer for scheduling. 20+ years of scheduling with constraints at IBM/ILOG (Q1616392) (← links)
- Combining constraint programming and temporal decomposition approaches -- scheduling of an industrial formulation plant (Q2117209) (← links)
- Short-term scheduling of production fleets in underground mines using CP-based LNS (Q2117237) (← links)
- The sample analysis machine scheduling problem: definition and comparison of exact solving approaches (Q2146991) (← links)
- An efficient filtering algorithm for the unary resource constraint with transition times and optional activities (Q2197325) (← links)
- Mixed integer linear programming and constraint programming models for the online printing shop scheduling problem (Q2664355) (← links)
- Underground mine scheduling of mobile machines using constraint programming and large neighborhood search (Q2664365) (← links)
- A graph-based constraint programming approach for the integrated process planning and scheduling problem (Q2668705) (← links)
- A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions (Q6048209) (← links)
- A constraint programming-based iterated greedy algorithm for the open shop with sequence-dependent processing times and makespan minimization (Q6068709) (← links)
- A reactive iterated greedy algorithm for the no-wait flowshop to minimize total tardiness (Q6574085) (← links)