Pages that link to "Item:Q1634110"
From MaRDI portal
The following pages link to Group-shop scheduling with sequence-dependent set-up and transportation times (Q1634110):
Displaying 6 items.
- A two-stage flow shop scheduling problem with transportation considerations (Q904289) (← links)
- An integrated producer-buyer supply chain with delivery cost under stochastic transportation time (Q2284717) (← links)
- Two-stage assembly scheduling problem for minimizing total tardiness with setup times (Q2293429) (← links)
- Accelerated dynamic programming algorithms for a car resequencing problem in automotive paint shops (Q2307010) (← links)
- New complexity results on scheduling problem in a robotic cell (Q4603936) (← links)
- An adapted constraint-programming formulation of the resource-constrained project scheduling problem applied to the identical parallel machines group shop and mixed shop scheduling problems (Q6659821) (← links)