Pages that link to "Item:Q1636886"
From MaRDI portal
The following pages link to A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem (Q1636886):
Displaying 10 items.
- Robust optimization models for project scheduling with resource availability cost (Q880580) (← links)
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem (Q992657) (← links)
- A fuzzy robustness measure for the scheduling of commissioned product development projects (Q2036560) (← links)
- A reduction tree approach for the discrete time/cost trade-off problem (Q2147020) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- Multimode resource-constrained project scheduling in flexible projects (Q2301187) (← links)
- The stochastic time–cost tradeoff problem: A robust optimization approach (Q3428916) (← links)
- Discrete Time-Cost Tradeoff with a Novel Hybrid Meta-Heuristic (Q3556554) (← links)
- Multi-mode bi-objective proactive project scheduling optimization considering robust cost (Q4996288) (← links)
- Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process (Q6588495) (← links)