Pages that link to "Item:Q1640602"
From MaRDI portal
The following pages link to Proportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobs (Q1640602):
Displaying 3 items.
- Single-machine scheduling with multi-agents to minimize total weighted late work (Q2197329) (← links)
- Proportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late Jobs (Q5012893) (← links)
- Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs (Q5058931) (← links)