Pages that link to "Item:Q1664896"
From MaRDI portal
The following pages link to A modified biogeography-based optimization for the flexible job shop scheduling problem (Q1664896):
Displaying 4 items.
- A new energy-aware flexible job shop scheduling method using modified biogeography-based optimization (Q1993083) (← links)
- A new leader guided optimization for the flexible job shop problem (Q2292167) (← links)
- Distributed assembly permutation flow-shop scheduling problem with sequence-dependent set-up times using a novel biogeography-based optimization algorithm (Q6048133) (← links)
- A decomposition-based artificial bee colony algorithm for the multi-objective flexible jobshop scheduling problem (Q6094486) (← links)