Pages that link to "Item:Q1666440"
From MaRDI portal
The following pages link to Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem (Q1666440):
Displaying 11 items.
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach (Q1730479) (← links)
- Integrating preventive maintenance planning and production scheduling under reentrant job shop (Q1993028) (← links)
- A joint optimization model of production scheduling and maintenance based on data driven for a parallel-series production line (Q2052118) (← links)
- Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach (Q2241323) (← links)
- Bi-objective ant colony optimization approach to optimize production and maintenance scheduling (Q2270442) (← links)
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314) (← links)
- Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems (Q2675651) (← links)
- A multi-objective optimization method of flexible job-shop lot-splitting scheduling (Q2886120) (← links)
- Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups (Q5059220) (← links)
- Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game (Q5359052) (← links)