Pages that link to "Item:Q1666672"
From MaRDI portal
The following pages link to Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672):
Displaying 3 items.
- Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness (Q2147170) (← links)
- From Project to Process Management: An Empirically-Based Framework for Analyzing Product Development Time (Q4849397) (← links)
- The seeds of the NEH algorithm: an overview using bibliometric analysis (Q6200788) (← links)