Pages that link to "Item:Q1667401"
From MaRDI portal
The following pages link to A biased random-key genetic algorithm for the project scheduling problem with flexible resources (Q1667401):
Displaying 10 items.
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems (Q781900) (← links)
- A new algorithm for resource-constrained project scheduling with breadth and depth of skills (Q2030541) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Evaluating typical algorithms of combinatorial optimization to solve continuous-time based scheduling problem (Q2331454) (← links)
- Multi-project scheduling problem under shared multi-skill resource constraints (Q2701180) (← links)
- A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource (Q5059351) (← links)
- Heuristic and metaheuristic methods for the multi‐skill project scheduling problem with partial preemption (Q6056166) (← links)
- Hybrid metaheuristics to solve a multiproduct two‐stage capacitated facility location problem (Q6092543) (← links)
- On the complexity of efficient multi-skilled team composition (Q6106584) (← links)
- Tabu search for proactive project scheduling problem with flexible resources (Q6164385) (← links)