The following pages link to P. C. Bagga (Q167945):
Displaying 38 items.
- Flowshop/no-idle scheduling to minimize total elapsed time (Q811886) (← links)
- Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times (Q1060679) (← links)
- Node elimination in three-machine flowshop scheduling problem (Q1169399) (← links)
- A note on equivalent jobs for job blocks in job sequencing problems (Q1255433) (← links)
- Sequencing with restrictions in processing times (Q1393012) (← links)
- Minimizing total elapsed time subject to zero total idle time of machines in \(n\times 3\) flowshop problem. (Q1396238) (← links)
- Bicriteria in special flowshop problems (Q1611454) (← links)
- Two stage production schedule (Q2557173) (← links)
- Two machine scheduling problem when passing allowed (Q2557648) (← links)
- Special class of flowshop sequencing problems (Q2780682) (← links)
- (Q3037111) (← links)
- (Q3040915) (← links)
- (Q3088470) (← links)
- (Q3212920) (← links)
- (Q3315255) (← links)
- (Q3321816) (← links)
- Optimal Algorithms for Job-Blocks in 2 × n Sequencing Problem with Transportation Times—A Computational Comparison (Q3332755) (← links)
- (Q3332756) (← links)
- (Q3343752) (← links)
- Flowshop/no-idle scheduling to minimise the mean flowtime (Q3365661) (← links)
- Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions (Q3677491) (← links)
- Special Cases With Set Up Considerations for n×3 Flowshop Problem (Q3683885) (← links)
- (Q3858001) (← links)
- (Q3887201) (← links)
- Note—A Node Elimination Procedure for Townsend's Algorithm for Solving the Single Machine Quadratic Penalty Function Scheduling Problem (Q3892057) (← links)
- (Q3901285) (← links)
- Single Machine Schednling Problem with Quadratic Function of Completion Times-A Modified Approach (Q3912340) (← links)
- Flow-Shop Sequencing with no Intratnachine Waiting: Minimization of Total Waiting Cost (Q3922463) (← links)
- The Sngle Machine Problem with Quadratic Penalty Function (Q3941175) (← links)
- (Q4143000) (← links)
- (Q4146533) (← links)
- (Q4227912) (← links)
- (Q4338563) (← links)
- Minimizing Mean Completion Time for Special Flowshop Problems (Q4341060) (← links)
- (Q4772954) (← links)
- (Q5545165) (← links)
- Sequencing with Random Service Times (Q5603737) (← links)
- Bicriteria in a two-stage flowshop scheduling problem. (Q5928328) (← links)