Pages that link to "Item:Q1687684"
From MaRDI portal
The following pages link to Scheduling preventive railway maintenance activities with resource constraints (Q1687684):
Displaying 12 items.
- Optimization of preventive condition-based tamping for railway tracks (Q322917) (← links)
- Scheduling of maintenance work of a large-scale tramway network (Q724038) (← links)
- Searching for multiobjective preventive maintenance schedules: combining preferences with evolutionary algorithms (Q857340) (← links)
- Timetable rearrangement to cope with railway maintenance activities (Q1652638) (← links)
- Clustering approach in maintenance of capillary railway network (Q1687690) (← links)
- A hybrid constraint programming/mixed integer programming framework for the preventive signaling maintenance crew scheduling problem (Q1744527) (← links)
- A problem of scheduling operations at a locomotive maintenance depot (Q1982909) (← links)
- Scheduling of maintenance windows in a mining supply chain rail network (Q2289897) (← links)
- Scheduling of railway track maintenance activities and crews (Q3157774) (← links)
- Scheduling preventive railway maintenance activities (Q3182654) (← links)
- An optimal track maintenance scheduling model analysis taking the risk of accidents into consideration (Q4624880) (← links)
- Improving the scheduling of railway maintenance projects by minimizing passenger delays subject to event requests of railway operators (Q6561224) (← links)